Charity Societies in Qatar Build a Big Water

Charity Societies in Qatar Build a Big Water Plant in Sudan


12/14/2015 |


  • 20,000 people from 19 villages in Sudan will benefit from the water plant which is being built at a cost of 3,000,000 QR.
  • The lab tests showed that the groundwater used in Saqadi can cause cancer which is why the water plant was important to stop the spread of diseases.
  • During the inspection visit, it was announced that the water plant will operate in two weeks.

QC has announced that the water plant it is supervising in Nile River state in Sudan will be ready this month. 20,000 people from 19 villages will benefit from it.

The project was funded by Qatar Red Crescent, Islamic Dawah Organization and QC who worked together as partners and paid an equal share for the implementation. The project was implemented at a cost of 3,000,000 QR. QC was responsible for supervising the work progress through its office in Khartoum.

Inspection Visit

A delegation from QC; headed by Mr. Youssef bin Ahmed Al Kuwari, QC’s CEO; paid an inspection visit to Saqadi region in Nile River State where the plant is being built. Mr. Kuwari was accompanied by Mr. Mohammed Hamed Al Billa, River Nile State Wali, and Mr. Rashid bin Abdul Rahman Al Nuaimi, Qatar Ambassador in Sudan.

During the visit, Engineer Al Hadi Adam, Director of Kanana Company, spoke about the work progress of the project and that the plant will start pumping drinking water in two weeks from the visit.

For his part, Mr. Al Nuaimi expressed his happiness that the project was about to be over. “Such developmental projects reinforce the relationships between the Qatari and Sudanese peoples,” said he. In addition, Mr. Al Billa addressed the people living in Saqadi and praised Qatar’s role in relieving those in need, sponsoring orphans, and implementing projects in Sudan. “This water project,” he said, “provides clean drinking water. We thank Qatar’s prince, government, people, and charity organizations who helped build this plant.”

Reasons for the Project

The reason for this project is to contribute to providing drinking water from the Nile River to limit the spread of diseases resulting from drinking polluted water. The lab results have shown that the groundwater the people of Saqadi used to drink from is greatly troubled and has Zink which causes cancer.

The project aims at providing drinking water to 20,000 people by constructing a water plant on the River Nile with water intake, intake pumps and a transporting line to deliver the raw water from the intake to the plant. There is also a main line to transport the water from the plant to 19 villages

The plant has a capacity of 2,000 m3 with a settling basin that has a capacity of 250 m3 and a water tank that has the capacity of 100 m3 and a height of 12 m. The plant also includes a laboratory to test the water, a store for chlorination materials and buildings for the operation and security crews.

Memorandum of Understanding

In order to make sure the plant is entirely built and that it will continue to work, QC; representing itself, Qatar Red Crescent and Islamic Dawah Organization; signed a memorandum of understanding with Drinking Water and Sanitation department at the Ministry of Water and Power and River Nile Administration. According to the memorandum, Drinking Water and Sanitation Department pledged to conduct the studies, design the projects, provide a supervising engineer, to issue exemption from customs duties and project imports value added tax, and to provide the targeted villages with water tanks. As for River Nile Administration, it pledged to build a water network from the Nile River to the water plant, to build a water network from the main water plant to the targeted villages of the project, to operate the plant after the experimental operation stage, to provide the necessary technical staff and to send periodic work progress reports to the two parties.

 

You can donate to support such projects through the link: Click here